• Construction

    7th Grade Course

     
    Students work in teams to develop and test a bridge design. A bridge simulation program called West Point Bridge Designer will first be used. Next, a bridge is constructed from the design and finally tested in a structural stress analyzer.
    Student Resources
     
     
     
     
     
     
     
     
     

     
    Lessons
     
     
     
     
     
     
     
     
     
     
     
     
     
    Disclaimer
    Last Modified on 5/10/2011 3:22:12 PM
Last Modified on October 11, 2018